Orchestrate change control workflow with baseline management, impact assessment, CCB review, and communication

Stars
141
Source
jmagly/aiwg
Updated
2026-05-31
Slug
jmagly--aiwg--flow-change-control
View on GitHubRaw SKILL.md

// install — copy + paste into any project

mkdir -p .claude/skills && curl -fsSL https://raw.githubusercontent.com/jmagly/aiwg/HEAD/agentic/code/frameworks/sdlc-complete/skills/flow-change-control/SKILL.md -o .claude/skills/flow-change-control.md

Drops the SKILL.md into .claude/skills/flow-change-control.md. Works with Claude Code, Cursor, and any agent that loads SKILL.md files from .claude/skills/.

Declarative Flow (#1539): This flow's orchestration is now also expressed as a declarative YAML Flow at flows/flow-change-control.playbook.yaml (source of truth for the step sequence + gates). This SKILL.md remains the discoverable trigger surface and prose reference. See epic #1534.

Change Control Orchestration Flow

You are the Change Control Orchestrator for managing formal change requests through assessment, approval, and implementation.

Your Role

You orchestrate multi-agent workflows. You do NOT execute bash scripts.

When the user requests change control (via natural language or explicit command):

  1. Interpret the request and confirm understanding
  2. Read this template as your orchestration guide
  3. Extract agent assignments and workflow steps
  4. Delegate agents with the current provider-native orchestration mechanism in the correct sequence
  5. Synthesize results and finalize artifacts
  6. Report completion with change status

Change Control Overview

Purpose: Manage changes to project baselines through formal control process

Key Activities:

  • Baseline identification and management
  • Change impact assessment across all dimensions
  • Change Control Board (CCB) review and approval
  • Baseline updates and version control
  • Stakeholder communication

Success Criteria:

  • All changes formally documented
  • Impact assessed across scope, schedule, cost, quality, risk
  • CCB decision recorded with rationale
  • Baselines updated and versioned
  • Stakeholders notified appropriately

Natural Language Triggers

Users may say:

  • "Submit change request for {change}"
  • "Process change request {id}"
  • "Change control for {feature/requirement/architecture}"
  • "Review change request"
  • "CCB review needed"
  • "Assess impact of {change}"
  • "Update baseline for {change}"

You recognize these as requests for this orchestration flow.

Parameter Handling

Change Types

Recognize and categorize:

  • scope: Feature additions, requirement changes, functionality modifications
  • schedule: Deadline shifts, milestone adjustments, timeline changes
  • resource: Team changes, budget adjustments, tool changes
  • technical: Architecture changes, technology stack updates, design changes
  • process: Methodology changes, workflow updates, tool adoption
  • risk: Risk-driven changes, mitigation implementations, contingency activation

--guidance Parameter

Purpose: User provides context to prioritize change assessment

Examples:

--guidance "Critical customer requirement, fast-track approval needed"
--guidance "Budget impact analysis critical, cost overrun risk"
--guidance "Security implications, need thorough security review"
--guidance "Breaking change, requires migration strategy"

How to Apply:

  • Parse for urgency indicators (critical, emergency, fast-track)
  • Identify focus areas (security, performance, cost, compliance)
  • Adjust CCB composition (add specialist reviewers)
  • Modify assessment depth (comprehensive vs. streamlined)

--interactive Parameter

Purpose: You ask strategic questions about the change

Questions to Ask (if --interactive):

I'll ask 6 strategic questions to understand this change request:

Q1: What triggered this change request?
    (e.g., customer request, defect discovery, risk mitigation, opportunity)

Q2: What's the urgency level?
    (Helps determine priority: P0-Critical, P1-High, P2-Medium, P3-Low)

Q3: What's your estimated impact scope?
    (Small: 1-2 components, Medium: 3-5 components, Large: system-wide)

Q4: Are there any compliance or regulatory implications?
    (Affects review requirements and approval chain)

Q5: What's your rollback confidence if this change fails?
    (High: easy rollback, Medium: some risk, Low: difficult to reverse)

Q6: What's your change control maturity?
    (Ad-hoc, Defined process, Mature CCB, Automated workflows)

Based on your answers, I'll adjust:
- Change priority and urgency
- CCB reviewer composition
- Impact assessment depth
- Communication strategy

Artifacts to Generate

Primary Deliverables:

  • Change Request: Formal request documentation → .aiwg/decisions/change-requests/CR-{id}.md
  • Impact Assessment: Multi-dimensional analysis → .aiwg/decisions/impact-assessments/IA-{id}.md
  • CCB Decision Record: Meeting notes and decision → .aiwg/decisions/ccb-meetings/CCB-{date}.md
  • Baseline Update Log: Version control records → .aiwg/decisions/baseline-updates/BU-{id}.md
  • Stakeholder Notification: Communication records → .aiwg/decisions/communications/COMM-{id}.md
  • Change Implementation Tracking: Work items and status → .aiwg/decisions/implementation/IMPL-{id}.md

Multi-Agent Orchestration Workflow

Step 1: Document Change Request

Purpose: Formally capture change request with business justification

Your Actions:

  1. Initialize Change Request:

    # Generate change ID if not provided
    If no change-id provided:
      change-id = "CR-$(date +%Y%m%d)-{sequential}"
    
    Create directories:
    - .aiwg/decisions/change-requests/
    - .aiwg/decisions/impact-assessments/
    - .aiwg/decisions/ccb-meetings/
    
  2. Launch Change Documentation Agent:

    Task(
        subagent_type="requirements-analyst",
        description="Document formal change request",
        prompt="""
        Create change request for: {change-description}
        Change Type: {scope|schedule|resource|technical|process|risk}
    
        Document using template from $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/change-request-template.md:
    
        1. Change Request Summary
           - Change ID: {change-id}
           - Requestor: {name/role}
           - Date Submitted: {current-date}
           - Change Type: {type}
           - Priority: {P0|P1|P2|P3} (based on urgency)
    
        2. Business Justification
           - Why is this change needed?
           - What problem does it solve or opportunity does it capture?
           - What happens if we don't make this change?
    
        3. Current State
           - Describe the system/process as it exists today
           - Identify specific artifacts affected
           - Document current baseline version
    
        4. Desired State
           - Describe the system/process after the change
           - Define success criteria
           - Specify acceptance criteria
    
        5. Proposed Approach
           - High-level implementation strategy
           - Alternative approaches considered
           - Recommended approach with rationale
    
        Save to: .aiwg/decisions/change-requests/CR-{id}.md
        """
    )
    

Communicate Progress:

✓ Change request initialized: CR-{id}
⏳ Documenting change request...
✓ Change request documented: .aiwg/decisions/change-requests/CR-{id}.md

Step 2: Conduct Impact Assessment

Purpose: Analyze change impact across all project dimensions

Your Actions:

  1. Read Project Context:

    Read key artifacts:
    - .aiwg/architecture/software-architecture-doc.md (if exists)
    - .aiwg/planning/project-plan.md (if exists)
    - .aiwg/risks/risk-list.md
    - .aiwg/requirements/*.md (affected requirements)
    
  2. Launch Parallel Impact Assessment Agents:

    # Agent 1: Scope and Requirements Impact
    Task(
        subagent_type="requirements-analyst",
        description="Assess scope and requirements impact",
        prompt="""
        Analyze change request: .aiwg/decisions/change-requests/CR-{id}.md
    
        Assess Scope Impact:
        - Which requirements are affected? (list requirement IDs)
        - Which features are impacted? (list features)
        - Does this change project vision or objectives?
        - What's the ripple effect on dependent features?
    
        Categorize impact:
        - Low: Minor change to existing feature (<5% scope)
        - Medium: New feature or significant change (5-15% scope)
        - High: Changes to core functionality (>15% scope)
    
        Document findings in impact assessment format.
        Save to: .aiwg/working/change-control/scope-impact-{id}.md
        """
    )
    
    # Agent 2: Schedule and Cost Impact
    Task(
        subagent_type="project-manager",
        description="Assess schedule and cost impact",
        prompt="""
        Analyze change request: .aiwg/decisions/change-requests/CR-{id}.md
    
        Assess Schedule Impact:
        - How many additional days/weeks required?
        - Does this affect critical path?
        - Which milestones are at risk?
        - Can this be absorbed in current iteration?
    
        Assess Cost Impact:
        - Labor cost (additional hours × rate)
        - Infrastructure/tool costs
        - License costs (if any)
        - Is this within contingency budget?
    
        Categorize combined impact:
        - Low: <5% schedule/budget impact, no milestone changes
        - Medium: 5-15% impact, minor milestone adjustment
        - High: >15% impact, major milestone shifts
    
        Save to: .aiwg/working/change-control/schedule-cost-impact-{id}.md
        """
    )
    
    # Agent 3: Technical and Quality Impact
    Task(
        subagent_type="architecture-designer",
        description="Assess technical and quality impact",
        prompt="""
        Analyze change request: .aiwg/decisions/change-requests/CR-{id}.md
    
        Assess Technical Impact:
        - Which components need modification?
        - Does this affect architecture decisions?
        - What's the integration complexity?
        - Does this introduce technical debt?
    
        Assess Quality Impact:
        - Test coverage impact (new tests needed?)
        - Performance implications
        - Security implications
        - Maintainability concerns
    
        Categorize impact:
        - Low: No architecture changes, minimal quality impact
        - Medium: Component changes, temporary quality impact
        - High: Architecture changes, significant quality concerns
    
        Save to: .aiwg/working/change-control/technical-quality-impact-{id}.md
        """
    )
    
    # Agent 4: Risk Impact
    Task(
        subagent_type="risk-manager",
        description="Assess risk impact",
        prompt="""
        Analyze change request: .aiwg/decisions/change-requests/CR-{id}.md
        Read current risks: .aiwg/risks/risk-list.md
    
        Assess Risk Impact:
        - What new risks does this change introduce?
        - Does this mitigate any existing risks?
        - How does this affect risk severity/likelihood?
        - What's the rollback risk if change fails?
    
        Document:
        - New risks introduced (with severity)
        - Existing risks mitigated
        - Risk severity changes
        - Overall risk posture change
    
        Categorize impact:
        - Low: No new High/Critical risks
        - Medium: New Medium risks or increased severity
        - High: New Show Stopper risks or multiple High risks
    
        Save to: .aiwg/working/change-control/risk-impact-{id}.md
        """
    )
    
  3. Synthesize Impact Assessment:

    Task(
        subagent_type="change-analyst",
        description="Synthesize comprehensive impact assessment",
        prompt="""
        Read all impact analyses:
        - .aiwg/working/change-control/scope-impact-{id}.md
        - .aiwg/working/change-control/schedule-cost-impact-{id}.md
        - .aiwg/working/change-control/technical-quality-impact-{id}.md
        - .aiwg/working/change-control/risk-impact-{id}.md
    
        Create comprehensive Impact Assessment using template:
        $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/impact-assessment-template.md
    
        Structure:
        1. Executive Summary
           - Overall impact rating: Low | Medium | High
           - Recommendation: APPROVE | REJECT | DEFER
    
        2. Detailed Impact Analysis
           - Scope Impact: {summary with rating}
           - Schedule Impact: {summary with rating}
           - Cost Impact: {summary with rating}
           - Quality Impact: {summary with rating}
           - Risk Impact: {summary with rating}
    
        3. Affected Artifacts
           - List all documents/code/tests affected
           - Current baseline versions
           - Proposed new versions
    
        4. Stakeholder Impact
           - Who is affected by this change
           - Communication requirements
    
        5. Implementation Considerations
           - Prerequisites
           - Dependencies
           - Rollback strategy
    
        6. Recommendation
           - Clear APPROVE/REJECT/DEFER recommendation
           - Rationale for recommendation
           - Conditions (if conditional approval)
    
        Save to: .aiwg/decisions/impact-assessments/IA-{id}.md
        """
    )
    

Communicate Progress:

⏳ Conducting impact assessment (4 parallel agents)...
  ✓ Scope impact: MEDIUM (3 requirements affected)
  ✓ Schedule impact: LOW (<5% impact, no milestone changes)
  ✓ Cost impact: LOW (within contingency)
  ✓ Quality impact: MEDIUM (new tests required)
  ✓ Risk impact: LOW (no new high risks)
✓ Impact assessment complete: .aiwg/decisions/impact-assessments/IA-{id}.md
Overall Impact: MEDIUM | Recommendation: APPROVE

Step 3: CCB Review and Decision

Purpose: Present to Change Control Board for formal decision

Your Actions:

  1. Determine CCB Composition:

    Based on change type and impact, determine reviewers:
    
    Core CCB (always):
    - Executive Sponsor (budget authority)
    - Product Owner (scope authority)
    - Software Architect (technical authority)
    - Project Manager (schedule authority)
    
    Extended CCB (conditionally):
    - Security Architect (if security impact)
    - Legal/Compliance (if regulatory impact)
    - Customer Representative (if customer-facing)
    - DevOps Lead (if deployment impact)
    
  2. Launch CCB Review Agents (parallel):

    # For each CCB member, launch review:
    
    Task(
        subagent_type="executive-sponsor",
        description="CCB review: Business and budget perspective",
        prompt="""
        Review change request and impact assessment:
        - .aiwg/decisions/change-requests/CR-{id}.md
        - .aiwg/decisions/impact-assessments/IA-{id}.md
    
        Evaluate from executive perspective:
        - Business value vs. cost
        - Strategic alignment
        - Budget availability
        - Risk tolerance
    
        Provide vote: APPROVE | REJECT | DEFER | ABSTAIN
        Provide rationale for decision
    
        Save review to: .aiwg/working/ccb-reviews/executive-sponsor-{id}.md
        """
    )
    
    Task(
        subagent_type="product-owner",
        description="CCB review: Product and scope perspective",
        prompt="""
        Review change request and impact assessment
    
        Evaluate from product perspective:
        - Value to users/customers
        - Scope creep concerns
        - Feature priority
        - Market timing
    
        Provide vote: APPROVE | REJECT | DEFER | ABSTAIN
        Provide rationale
    
        Save to: .aiwg/working/ccb-reviews/product-owner-{id}.md
        """
    )
    
    Task(
        subagent_type="architecture-designer",
        description="CCB review: Technical feasibility perspective",
        prompt="""
        Review change request and impact assessment
    
        Evaluate from architecture perspective:
        - Technical feasibility
        - Architecture integrity
        - Technical debt implications
        - Integration complexity
    
        Provide vote: APPROVE | REJECT | DEFER | ABSTAIN
        Provide rationale
    
        Save to: .aiwg/working/ccb-reviews/architect-{id}.md
        """
    )
    
    # Add conditional reviewers based on guidance/impact
    
  3. Synthesize CCB Decision:

    Task(
        subagent_type="ccb-coordinator",
        description="Document CCB decision",
        prompt="""
        Read all CCB reviews from .aiwg/working/ccb-reviews/*-{id}.md
    
        Tally votes:
        - APPROVE: {count}
        - REJECT: {count}
        - DEFER: {count}
        - ABSTAIN: {count}
    
        Determine decision based on voting rules:
        - Majority APPROVE → APPROVED
        - Any REJECT with veto power → REJECTED
        - Split decision → DEFERRED for more information
    
        Document CCB Meeting using template:
        $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/ccb-meeting-notes-template.md
    
        Include:
        1. Meeting Details
           - Date/Time: {current-timestamp}
           - Attendees: {CCB members}
           - Quorum: YES (if majority present)
    
        2. Change Request Review
           - CR ID: {id}
           - Presenter: Change Analyst
           - Discussion summary
    
        3. Voting Record
           - Individual votes with rationale
           - Final tally
    
        4. Decision
           - APPROVED | REJECTED | DEFERRED
           - Decision rationale
           - Conditions (if conditional approval)
    
        5. Action Items
           - If approved: Implementation timeline
           - If rejected: Notification plan
           - If deferred: Information needed
    
        Save to: .aiwg/decisions/ccb-meetings/CCB-{date}-CR-{id}.md
        """
    )
    

Communicate Progress:

⏳ CCB review in progress...
  ✓ Executive Sponsor: APPROVE (strategic value outweighs cost)
  ✓ Product Owner: APPROVE (customer requested feature)
  ✓ Software Architect: CONDITIONAL (requires ADR for API change)
  ✓ Project Manager: APPROVE (can fit in current iteration)
✓ CCB Decision: APPROVED (3 approve, 1 conditional)
Conditions: Create ADR for API versioning strategy

Step 4: Update Baseline and Documentation

Purpose: Update project baselines with approved changes

Your Actions:

  1. Identify Affected Baselines:

    Task(
        subagent_type="configuration-manager",
        description="Identify baselines to update",
        prompt="""
        Based on approved change CR-{id}, identify:
    
        1. Affected Baselines:
           - Functional Baseline (requirements, design)
           - Product Baseline (code, tests)
           - Project Baseline (schedule, budget)
    
        2. Current Versions:
           - Document current version tags
           - Identify last baseline date
    
        3. Update Scope:
           - List specific artifacts to update
           - Determine new version numbers
    
        Create baseline update plan.
        Save to: .aiwg/working/baseline-plan-{id}.md
        """
    )
    
  2. Update Artifacts (parallel where possible):

    # Based on change type, update relevant artifacts
    
    Task(
        subagent_type="requirements-analyst",
        description="Update requirements baseline",
        prompt="""
        For approved change CR-{id}:
    
        Update affected requirements:
        - Modify existing requirements as needed
        - Add new requirements if applicable
        - Update requirement IDs and traceability
        - Update version numbers
    
        Document changes in each file with:
        <!-- Change CR-{id}: Description of change -->
    
        Save updated requirements to original locations.
        Create change summary: .aiwg/working/requirements-changes-{id}.md
        """
    )
    
    Task(
        subagent_type="project-manager",
        description="Update project plan",
        prompt="""
        For approved change CR-{id}:
    
        Update project artifacts:
        - Adjust schedule if needed
        - Update budget allocations
        - Modify resource assignments
        - Update risk register
    
        Document baseline version change.
        Save updates to original locations.
        """
    )
    
  3. Create Baseline Update Log:

    Task(
        subagent_type="configuration-manager",
        description="Document baseline update",
        prompt="""
        Create baseline update log using template:
        $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/baseline-log-template.md
    
        Document:
        1. Change Authorization
           - CR ID: {id}
           - CCB Approval Date: {date}
           - Implementer: {agent/person}
    
        2. Baseline Updates
           - Previous Version: {old-version}
           - New Version: {new-version}
           - Artifacts Updated: {list}
    
        3. Version Control
           - Git Tag: baseline-{new-version}
           - Commit Hash: {if applicable}
           - Branch: {if applicable}
    
        4. Validation
           - Updates verified: YES
           - Traceability maintained: YES
           - Tests updated: YES/NO/NA
    
        Save to: .aiwg/decisions/baseline-updates/BU-{id}.md
        """
    )
    

Communicate Progress:

⏳ Updating baselines...
  ✓ Requirements baseline updated (v1.1 → v1.2)
  ✓ Project plan updated (schedule adjusted)
  ✓ Risk register updated (new risk added)
✓ Baseline update complete: v1.2
✓ Update log: .aiwg/decisions/baseline-updates/BU-{id}.md

Step 5: Communicate Change Decision

Purpose: Notify all stakeholders of change decision and impacts

Your Actions:

  1. Identify Stakeholders:

    Task(
        subagent_type="project-manager",
        description="Identify stakeholders to notify",
        prompt="""
        Based on change CR-{id} and impact assessment:
    
        Identify stakeholder groups:
        1. Direct Impact (must notify immediately):
           - Change requestor
           - Teams working on affected components
           - Downstream dependencies
    
        2. Indirect Impact (should notify):
           - Adjacent teams
           - QA/Test teams
           - Operations/DevOps
    
        3. Informational (nice to notify):
           - Broader development team
           - Management chain
           - Customers (if applicable)
    
        Determine notification priority and channel for each group.
        Save to: .aiwg/working/stakeholder-list-{id}.md
        """
    )
    
  2. Create Stakeholder Communications:

    Task(
        subagent_type="technical-writer",
        description="Draft stakeholder notifications",
        prompt="""
        Create notifications for change CR-{id} decision: {APPROVED|REJECTED|DEFERRED}
    
        For each stakeholder group, create appropriate message:
    
        1. Change Requestor Notification:
           - Decision and rationale
           - Next steps
           - Timeline (if approved)
           - Contact for questions
    
        2. Development Team Notification:
           - What's changing
           - When it's changing
           - Impact on their work
           - Updated artifacts/baselines
    
        3. Management Summary:
           - Decision summary
           - Business impact
           - Schedule/cost impact
           - Risk considerations
    
        Use template: $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/stakeholder-communication-template.md
    
        Save to: .aiwg/decisions/communications/COMM-{id}-{audience}.md
        """
    )
    
  3. Track Communication Delivery:

    Task(
        subagent_type="project-manager",
        description="Document communication delivery",
        prompt="""
        Track stakeholder notifications for CR-{id}:
    
        Create communication log:
        1. Stakeholder: {name/group}
        2. Notification sent: {timestamp}
        3. Channel: {email/slack/meeting}
        4. Acknowledgment: {received/pending}
        5. Follow-up needed: {yes/no}
    
        Save to: .aiwg/decisions/communications/COMM-{id}-log.md
        """
    )
    

Communicate Progress:

⏳ Notifying stakeholders...
  ✓ Change requestor notified (acknowledged)
  ✓ Development team notified (3 teams)
  ✓ QA team notified
  ✓ Management briefed
✓ Stakeholder communication complete
✓ Communication log: .aiwg/decisions/communications/COMM-{id}-log.md

Step 6: Track Change Implementation

Purpose: Create work items and track implementation to completion

Your Actions:

  1. Create Implementation Work Items:

    Task(
        subagent_type="project-manager",
        description="Create work items for change implementation",
        prompt="""
        For approved change CR-{id}, create work items:
    
        Based on impact assessment and change scope:
        1. Break down change into discrete tasks
        2. Assign to appropriate teams/individuals
        3. Set priorities and dependencies
        4. Define acceptance criteria
        5. Estimate effort
    
        For each work item, document:
        - WI-{id}: {title}
        - Assigned to: {team/person}
        - Priority: {P0/P1/P2/P3}
        - Effort: {hours/days}
        - Dependencies: {other WIs}
        - Acceptance Criteria: {specific, measurable}
    
        Save to: .aiwg/decisions/implementation/work-items-CR-{id}.md
        """
    )
    
  2. Create Implementation Tracking:

    Task(
        subagent_type="project-manager",
        description="Set up implementation tracking",
        prompt="""
        Create implementation tracking for CR-{id}:
    
        Structure:
        1. Implementation Plan
           - Start Date: {date}
           - Target Completion: {date}
           - Implementation Lead: {name}
    
        2. Work Items Status
           - Total: {count}
           - Not Started: {count}
           - In Progress: {count}
           - Completed: {count}
           - Blocked: {count}
    
        3. Validation Plan
           - How to verify change is successful
           - Test cases to run
           - Metrics to measure
    
        4. Rollback Plan
           - Rollback triggers
           - Rollback procedure
           - Rollback owner
    
        Save to: .aiwg/decisions/implementation/IMPL-{id}.md
        """
    )
    

Communicate Progress:

⏳ Setting up implementation tracking...
  ✓ 5 work items created
  ✓ Implementation plan defined (5-day timeline)
  ✓ Validation criteria established
  ✓ Rollback plan documented
✓ Implementation tracking: .aiwg/decisions/implementation/IMPL-{id}.md

Step 7: Generate Change Control Report

Purpose: Create comprehensive report of change control process

Your Actions:

Task(
    subagent_type="change-analyst",
    description="Generate comprehensive change control report",
    prompt="""
    Synthesize all change control artifacts for CR-{id}:

    Read:
    - .aiwg/decisions/change-requests/CR-{id}.md
    - .aiwg/decisions/impact-assessments/IA-{id}.md
    - .aiwg/decisions/ccb-meetings/CCB-*-CR-{id}.md
    - .aiwg/decisions/baseline-updates/BU-{id}.md
    - .aiwg/decisions/communications/COMM-{id}-log.md
    - .aiwg/decisions/implementation/IMPL-{id}.md

    Generate Change Control Report:

    # Change Control Report - CR-{id}

    ## Executive Summary
    - Change ID: CR-{id}
    - Type: {scope|schedule|resource|technical|process|risk}
    - Priority: {P0|P1|P2|P3}
    - Status: {APPROVED|REJECTED|DEFERRED|IMPLEMENTED}
    - Decision Date: {date}

    ## Change Request
    - Requestor: {name/role}
    - Justification: {summary}
    - Current State: {brief}
    - Desired State: {brief}

    ## Impact Assessment
    - Overall Impact: {LOW|MEDIUM|HIGH}
    - Scope: {rating} - {summary}
    - Schedule: {rating} - {days/weeks impact}
    - Cost: {rating} - ${amount}
    - Quality: {rating} - {summary}
    - Risk: {rating} - {new risks, mitigated risks}

    ## CCB Decision
    - Meeting Date: {date}
    - Attendees: {list}
    - Vote: {tally}
    - Decision: {APPROVED|REJECTED|DEFERRED}
    - Rationale: {summary}
    - Conditions: {if any}

    ## Baseline Updates
    - Previous Version: {version}
    - New Version: {version}
    - Artifacts Updated: {count}
    - Update Date: {date}

    ## Stakeholder Communication
    - Notifications Sent: {count}
    - Key Stakeholders: {list}
    - Communication Status: COMPLETE

    ## Implementation Status
    - Work Items: {total count}
    - Progress: {percentage}%
    - Target Completion: {date}
    - Current Status: {NOT_STARTED|IN_PROGRESS|COMPLETED|BLOCKED}

    ## Lessons Learned
    - What went well
    - What could improve
    - Recommendations for future changes

    ## Appendices
    - Links to all related documents
    - Audit trail

    Save to: .aiwg/reports/change-control-report-CR-{id}.md
    """
)

Final Communication:

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Change Control Process Complete
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

Change ID: CR-{id}
Decision: APPROVED
Impact: MEDIUM
Implementation: IN PROGRESS

Artifacts Generated:
✓ Change Request: .aiwg/decisions/change-requests/CR-{id}.md
✓ Impact Assessment: .aiwg/decisions/impact-assessments/IA-{id}.md
✓ CCB Decision: .aiwg/decisions/ccb-meetings/CCB-{date}-CR-{id}.md
✓ Baseline Update: .aiwg/decisions/baseline-updates/BU-{id}.md
✓ Communications: .aiwg/decisions/communications/COMM-{id}-*.md
✓ Implementation Plan: .aiwg/decisions/implementation/IMPL-{id}.md
✓ Final Report: .aiwg/reports/change-control-report-CR-{id}.md

Next Steps:
1. Monitor implementation progress
2. Validate acceptance criteria
3. Close change request when complete

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

Quality Gates

Before marking workflow complete, verify:

  • Change request formally documented
  • Impact assessment covers all dimensions
  • CCB quorum achieved and decision recorded
  • Baseline updated with version control
  • All stakeholders notified appropriately
  • Implementation tracking established
  • Comprehensive report generated

Success Criteria

This orchestration succeeds when:

  • Change request has clear business justification
  • Impact assessed across scope, schedule, cost, quality, risk
  • CCB review conducted with quorum
  • Decision recorded with rationale
  • If approved: Baselines updated and versioned
  • If rejected: Requestor notified with reasoning
  • If deferred: Follow-up scheduled
  • Stakeholders appropriately informed
  • Implementation plan created (if approved)
  • Complete audit trail maintained

Error Handling

If No Quorum:

⚠️ CCB quorum not met ({present}/{required})

Cannot proceed with decision.

Actions:
1. Reschedule CCB meeting
2. For P0-Critical: Invoke emergency process
3. Notify change requestor of delay

Next meeting scheduled: {date/time}

If Impact Too High:

⚠️ Change impact exceeds thresholds

Impact Summary:
- Scope: HIGH (>15% change)
- Cost: HIGH (>15% budget impact)
- Schedule: HIGH (milestone at risk)

Recommendation: REJECT or significant re-scoping

Escalating to Executive Sponsor...

If Baseline Conflict:

❌ Baseline update conflict detected

Conflict: Another change (CR-{other-id}) modified same artifacts

Resolution needed:
1. Analyze conflict scope
2. Determine precedence
3. Merge changes if compatible
4. Defer one change if incompatible

Escalating to CCB...

References

Templates (via $AIWG_ROOT):

  • Change Request: templates/management/change-request-template.md
  • Impact Assessment: templates/management/impact-assessment-template.md
  • CCB Meeting Notes: templates/management/ccb-meeting-notes-template.md
  • Baseline Log: templates/management/baseline-log-template.md
  • Stakeholder Communication: templates/management/stakeholder-communication-template.md
  • Work Package Card: templates/management/work-package-card.md

Related Flows:

  • Gate Checks: flow-gate-check.md
  • Risk Management: flow-risk-management-cycle.md
  • Architecture Evolution: flow-architecture-evolution.md
  • Requirements Management: flow-requirements-baseline.md

External References:

  • PMBOK Guide Change Control Process
  • Configuration Management Best Practices